Complete a Checklist (Mobile)

The Requirements screen contains any required checklists and required before and after photos. Perform these steps after you locate the work order and check in.

Checklists are usually added to a Preventative Maintenance work order. You must complete the checklist, which can include routine and non-routine tasks to ensure the system does not suffer any drastic failures. Checklists are created by the Motili Project team and attached to the work order.

  1. In this example, two checklists are required for this property. Tap a checklist and review the tasks.
    Items that are required before you can submit the Work Order have a red exclamation point.
  2. After you perform each task in this checklist, tap the item to add a check mark to show that it is completed. If you are interrupted, tape Save. If some items in the checklist do not apply to your job, tap the Not Applicable (N/A) check box and tap Complete.
    Tap N/A if that action cannot be performed on the equipment you are asset tagging.
  3. Complete each checklist and tap Confirm to upload it, then tap Back. A green check marks appear next to each completed checklist.
    This screen shows that you need to upload photos before you are done asset tagging.
  4. The Requirements section now contains a green check mark.
    Verify that the Requirements section has a green check mark.

If asset tagging is also required for the job, see Tag an Asset (Mobile).

See Also